Improving the seismic resilience of dams in India: A case of Maithon Dam, Jharkhand state

Source(s): World Bank, the Global Facility for Disaster Reduction and Recovery, the (GFDRR) World Bank Disaster Risk Management Hub

In times of a changing climate, water security is a central component of long-term resilience – and dams are vital for safeguarding such security. India, with a population of more than 1 billion people, is home almost 5,000 large dams and 350 more are currently under construction. The country also has several thousand additional small dams. Each plays a part in the nation’s water regulation mechanisms for use across a multitude of economic sectors, including agriculture, energy creation, flood control, and tourism.

As water and dam security has come into focus, the Indian Government’s Central Water Commission (CWC), with assistance from the World Bank, began the Dam Rehabilitation and Improvement Project (DRIP), a six-year, US$350-million program to rehabilitate selected dams. The ”Japan-World Bank Program for Mainstreaming Disaster Risk Management in Developing Countries” and its implementing arm, the World Bank Disaster Risk Management Hub, Tokyo, has also played a central role in this process.

Since DRIP’s inception, one area has come into focus – that of building resilience against seismic risk. Engineers and policymakers saw that inspection, reporting, and updates in this area are critical needs. Many of dams in India face operational and monitoring weakness, and need to establish disaster resilient operation and maintenance (O&M) procedures. These conditions affect the safety of the structures and pose risks to life and properties of people downstream of the dams. In addition, large-scale earthquakes have been recorded in the region each year.

In response to these challenges, over the past two years, DRIP has coordinated with the World Bank’s DRM Hub, Tokyo the organization of dam safety study tours for Indian government officials to Japan to better understand the work and experiences of the Japan Water Agency (JWA) and the Ministry of Land, Infrastructure, Transport, and Tourism (MLIT). In October 2016, JWA has conducted a seismic emergency response drill and developed a Post-earthquake Inspection Manual for Ichari Dam in Uttarakhand, India. This past July, a team of JWA officials, who oversee operations and management of major river-basin dams in Japan, visited India, to both evaluate the overall dam safety, and drill down to its specific seismic event response systems.

In addition to overall discussions of seismic risk, the JWA team of engineers focused the visit on Maithon Dam, in Jharkhand State in eastern India, as a pilot in this seismic resilience project. Maithon Dam is a composite dam, of both earth and concrete, measuring more than 4,000 meters long with a 360-meter overflow section. Built in 1957, the dam provides important irrigation needs in this rural state, as well as serving as a flood control mechanism. Critically, it also supplies 60,000kW of power from its underground power station, the first of this type of electrification facility in the region. The generation, transmission & distribution of electricity makes it a central piece of infrastructure for eastern India.

The JWA team consisted of six engineers, who specialize in dam safety, electric and information systems, and mechanical facilities. In partnership with Indian officials, the JWA team utilized their long and extensive experience in earthquake dam safety in Japan to apply to the condition of Maithon, as well as other dams in India.

After the visit, and in partnership with Indian colleagues, JWA set out several operational goals for Maithon Dam in the coming months ahead. JWA will prepare an Inspection Manual for Maithon dam after seismic event for the field engineers and operators, as well as the operating authority, the Damodar Valley Corporation. JWA has provided several recommendations, as follows:

  • Provide training and guidance on overall dam safety and the DRIP program
  • Review operation and maintenance methods
  • Draft updated guidelines and procedures on protection against seismic risk
  • Perform training exercises at the dam site to test process during a seismic event
  • Establish a strong communications system on seismic information
  • Perform structural strengthening of dams, including rehabilitation and improvement of spillways, regulators, draw-off, and stilling basins
  • Improve safety instrumentation

The World Bank’s DRIP, in close partnership with the DRM Hub, Tokyo, will pursue its stated goal of improving the safety and performance of existing dams and strengthening institutional capacity, especially by using new technologies. JWA will continue to strengthen the ties with local agencies, providing technical assistance for developing sustainable earthquake response systems and improving the resilience of dams across India.

Explore further

Hazards Earthquake
Country and region India
Share this

Please note: Content is displayed as last posted by a PreventionWeb community member or editor. The views expressed therein are not necessarily those of UNDRR, PreventionWeb, or its sponsors. See our terms of use

Is this page useful?

Yes No Report an issue on this page

Thank you. If you have 2 minutes, we would benefit from additional feedback (link opens in a new window).